MID energy meter
Calculation Example (Excel—German)
| Selection Criteria | Sum of Amounts | Vector Summation | |
| Includes cos(φ) | Yes | Yes | |
| MID certified | yes | yes | |
| Class 1 for active energy | Yes | Yes | |
| Offsetting of energy consumers and generators on the same register | No | yes |
- Direct connection up to 80 A or transformer connection (M3PRO)
- Password-protected access
- Illuminated display
- M-Bus EN13757 / Modbus RTU integrated (or optional)
- Dual tariff T1 / T2 4-quadrant measurement
- Class 1 for active energy, MID-tested
- Installation width 72 mm, DIN mounting (M3PRO)
- Sealed terminal cover
- All measured values can be read out
Summation by Amount vs. Vector Summation:
The VSE has published a mandatory calculation guideline for the smart meter rollout: “Vector summation must be used for smart meter rollouts.”
A distinction is made between vector summation (Mode A) and absolute value summation (Mode B):
Vector summation (Mode A):
- For end consumers only > preferred
- For end consumers with additional feed-in > required
Absolute value summation (Mode B):
- For end consumers only > possible
- For end consumers with additional feed-in > not permitted
MID energy meter
Calculation Example (Excel—German)
| Selection Criteria | Sum of Amounts | Vector Summation | |
| Includes cos(φ) | Yes | Yes | |
| MID certified | yes | yes | |
| Class 1 for active energy | Yes | Yes | |
| Offsetting of energy consumers and generators on the same register | No | yes |
- Direct connection up to 80 A or transformer connection (M3PRO)
- Password-protected access
- Illuminated display
- M-Bus EN13757 / Modbus RTU integrated (or optional)
- Dual tariff T1 / T2 4-quadrant measurement
- Class 1 for active energy, MID-tested
- Installation width 72 mm, DIN mounting (M3PRO)
- Sealed terminal cover
- All measured values can be read out
Summation by Amount vs. Vector Summation:
The VSE has published a mandatory calculation guideline for the smart meter rollout: “Vector summation must be used for smart meter rollouts.”
A distinction is made between vector summation (Mode A) and absolute value summation (Mode B):
Vector summation (Mode A):
- For end consumers only > preferred
- For end consumers with additional feed-in > required
Absolute value summation (Mode B):
- For end consumers only > possible
- For end consumers with additional feed-in > not permitted